What Happened to Lockheed Martin F-35 Lightning II?
The Lockheed Martin F-35 Lightning II is a family of single-seat, single-engine, supersonic stealth multirole combat aircraft, developed for the U.S. and its allies. Initiated in 1996, the program has grown into the most expensive weapons system in history, with a projected lifecycle cost exceeding $2 trillion through 2088. As of July 2026, over 1,300 F-35s are in service globally, but the program faces ongoing challenges with modernization efforts like Block 4, sustainment, and declining mission-capable rates, despite record deliveries in 2025 and continued international demand.
Quick Answer
The Lockheed Martin F-35 Lightning II is a critical fifth-generation stealth fighter for the U.S. and its allies, with over 1,300 aircraft in service as of July 2026. However, the program is grappling with significant challenges, including delays and cost overruns for its crucial Block 4 modernization and Technology Refresh 3 (TR-3) upgrades, which only began reaching combat-capable jets in 2026. Sustainment issues have led to a decline in fleet-wide mission-capable rates to 44% in fiscal year 2025. Despite these hurdles, Lockheed Martin anticipates sustaining an annual production rate of 156 jets, supported by continued demand and recent contracts for engine spare parts and maintenance platform expansion in July 2026.
📊Key Facts
📅Complete Timeline15 events
Joint Strike Fighter Program Begins
The Joint Strike Fighter program, which would eventually lead to the F-35, officially commenced.
Lockheed Martin X-35 Wins JSF Competition
Lockheed Martin's X-35 prototype was selected over Boeing's X-32 to win the Joint Strike Fighter program, leading to the development of the F-35.
F-35A First Flight
The F-35A conventional takeoff and landing variant conducted its maiden flight.
F-35B Enters U.S. Marine Corps Service
The F-35B short take-off and vertical-landing variant was introduced into service with the U.S. Marine Corps.
F-35A Enters U.S. Air Force Service
The F-35A variant officially entered service with the U.S. Air Force.
F-35 First Combat Deployment
The F-35 saw its first combat use, with Israeli F-35s conducting strikes in Syria and U.S. F-35Bs engaging targets in Afghanistan.
Turkey Removed from F-35 Program
Turkey was formally removed from the F-35 development and production program following its acquisition of the Russian S-400 missile defense system.
F-35 Deliveries Halted Due to TR-3 Issues
F-35 aircraft deliveries were paused for a year due to difficulties with the Technology Refresh 3 (TR-3) hardware and software, impacting production schedules.
Record F-35 Deliveries Announced for 2025
Lockheed Martin announced a record 191 F-35 deliveries in 2025, surpassing previous records and bringing the global fleet to approximately 1,300 aircraft.
Block 4 Upgrade Truncated and Delayed
The F-35's Block 4 modernization upgrade was announced to be truncated and further delayed, with critical changes now expected by 2031 at the earliest, five years behind schedule.
Pentagon Reduces FY2026 F-35 Orders
The Pentagon significantly reduced its planned F-35 procurements for Fiscal Year 2026 by 45%, cutting orders to 47 aircraft due to availability, software issues, and funding shifts.
US F-35 Emergency Landing After Iran Mission
A U.S. F-35 fighter jet made an emergency landing at a Middle East airbase after a combat mission over Iran; Iranian media claimed it was hit, though the U.S. did not confirm.
First F-35Bs Receive TR-3 Upgrades at FRCE
Fleet Readiness Center East (FRCE) completed the conversion of its first F-35B aircraft from the Technology Refresh 2 (TR-2) to the advanced TR-3 configuration, laying the groundwork for Block 4.
F135 Engine Core Upgrade Nears Critical Design Review
The F135 Engine Core Upgrade (ECU), designed to provide more thrust and cooling for the F-35, is expected to reach its critical design review in August 2026, a key milestone.
Pratt & Whitney Awarded $1.3 Billion F135 Sustainment Contract
Pratt & Whitney, an RTX business, was awarded a nearly $1.3 billion contract for F135 engine spare parts for fiscal year 2026, aimed at strengthening global sustainment for the F-35 fleet.
🔍Deep Dive Analysis
The Lockheed Martin F-35 Lightning II program, which commenced in November 1996, has evolved into the most ambitious and expensive defense initiative in history, with a projected acquisition and sustainment cost exceeding $2 trillion over its 77-year lifespan through 2088. Designed as a versatile fifth-generation multirole combat aircraft, the F-35 aims to provide air superiority, strike capabilities, electronic warfare, and intelligence, surveillance, and reconnaissance functions for the U.S. Air Force, Navy, and Marine Corps, as well as numerous international partners.
The program's immense cost and complexity are primarily driven by its state-of-the-art stealth technology, advanced sensor fusion, and the requirement to replace a multitude of legacy aircraft across different services and allied nations. The F-35's ability to integrate diverse data streams into a single, fused tactical picture for the pilot is a core strength, enabling it to operate effectively in contested airspace. Key turning points include Lockheed Martin's X-35 winning the Joint Strike Fighter competition in 2001, the F-35A's first flight in 2006, and its entry into U.S. service between 2015 and 2019. The aircraft first saw combat in 2018, with Israeli F-35s in Syria and U.S. Marine Corps F-35Bs in Afghanistan.
However, the F-35 program has been consistently plagued by challenges, particularly concerning its Block 4 modernization and Technology Refresh 3 (TR-3) upgrades. TR-3, the computing and memory foundation for Block 4, experienced significant hardware and software delays, leading to a halt in aircraft deliveries from July 2023 to July 2024. Combat-capable TR-3 jets only began reaching squadrons in 2026, approximately three years late. The Block 4 upgrade, intended to add new weapons, electronic warfare improvements, and radar enhancements, is now expected to be completed by 2031 at the earliest, five years beyond its original schedule, and has seen its estimated cost increase by at least $6 billion.
These delays and technical issues have had tangible consequences for fleet readiness. The Government Accountability Office (GAO) reported in June 2026 that the fleet-wide mission-capable rate declined from 67% in fiscal 2021 to 44% in fiscal 2025, with the full mission-capable rate dropping to 25%. Sustainment has emerged as a major problem, with the current support structure struggling to keep pace with the growing global fleet of over 1,300 aircraft. Furthermore, the F135 engine's power and cooling margin are nearly exhausted, necessitating an Engine Core Upgrade (ECU) and a separate power-and-thermal-management upgrade, with the ECU's critical design review slated for August 2026.
As of July 31, 2026, the F-35 remains a cornerstone of U.S. and allied air power, with Lockheed Martin expecting to sustain an annual production rate of 156 aircraft due to ongoing demand. Recent developments include a nearly $1.3 billion contract awarded to Pratt & Whitney for F135 engine spare parts to bolster global sustainment and the U.S. Air Force's expansion of Blade Diagnostics' SmartBlend engine maintenance platform for F-35 engines. Operationally, F-35s participated in Exercise Pitch Black 2026 in Australia and U.S. F-35 squadrons were certified for combat operations during Combat Archer UK 2026. However, geopolitical tensions saw an F-35 make an emergency landing after a combat mission over Iran in March 2026, with conflicting reports on whether it was hit. The U.S. also significantly reduced its planned F-35 procurements for Fiscal Year 2026 by 45%, acquiring only 47 aircraft, partly due to funding shifts towards sixth-generation fighter development. Turkey's re-entry into the program remains blocked due to its S-400 missile system acquisition.
What If...?
Explore alternate histories. What if Lockheed Martin F-35 Lightning II made different choices?